Reports
Reports Relating to Elkhead Reservoir
___________________________________________________________

All files are in .pdf format and require Adobe Acrobat Reader
software to open. Click on the Adobe logo to get a free download.
Elkhead Dam/Reservoir Hydrology Reports:
Preliminary Geotechnical Investigation Elkhead Dam
Appendix A: Field Investigations
Appendix B: Geophysical Survey
Appendix C: Laboratory Test Results
Construction Alternatives Figure 1 - Site Plan
Figure 2 - Typical Embankment Raise Section
Figure 3 - Embankment Plan for Alternatives
Figure 4 - Outlet Works Elevation for Alternatives
Figure 5 - Outlet Works for Profile for Drained Reservoir Alternative 1 and Lower Reservoir Alternative 2
Figure 6 - Outlet Works for Profile for Lower Reservoir Alternative 3
Elkhead Hydrology Report
Elkhead Hydrology Figures
Yampa Valley Water Demand Study
Feasibility Evaluation of Non-Native Fish Control Structures
Fish Separation Preliminary Design Report
Yampa River Basin Managment Plan, Environmental Assessment and Appendices
|